How to open new CM workorder?

You are here:
< Back
There are 2 methods to add new PM Report:
  • Corrective > New Workorder
  • Corrective > Insert  Workorder

New Workorder is to open a new corrective maintenance work order (Status: ‘Open’)

  • Fill in the form to report new asset breakdown
  • For breakdown date, user can choose the date or just simply tick the current time box
  • “Defective” is a description of the breakdown
  • “Category” will be listed as created in Setting > Corrective
  • “Assign To” is to choose which user shall receive this workorder notification via Telegram
  • “Picture Reported” is for the image of the breakdown asset

Insert Workorder is to insert corrective maintenance work order that has been done to skip all the corrective maintenance process

Share This
Scroll to Top